USA_64zone_GTEP_case

Case path: ModelCases/USA_64zone_GTEP_case Data path: ModelCases/USA_64zone_GTEP_case/Data_USA64_GTEP

Model Setup Snapshot

SettingValue
model_modeGTEP
solvergurobi
resource_aggregation0
endogenous_rep_day0
external_rep_day1
planning_reserve_mode0
operation_reserve_mode0
transmission_expansion1
carbon_policy0
clean_energy_policy0

System Scale Overview

MetricValue
Zones64
Transmission regions11
Existing generators667
Candidate generators830
Existing transmission lines122
Candidate transmission lines140
Existing generator capacity1,178,149.1 MW
Candidate generator capacity35,866,189.1 MW
Existing line capacity sum209,348.0 MW
Sum of zonal peak demands777,401.0 MW
Modeled time-series rows480
Solved total system cost$61,958,382,751.4

HOPE Results Summary

Note: this page reports HOPE run outputs only. Cross-model comparisons are omitted because input assumptions are not aligned.

Transmission Buildout Summary

MetricValue
HOPE built corridors (MW > 0)81
HOPE total buildout521,234.2 MW
Existing transmission capacity sum209,348.0 MW
CorridorHOPE build (MW)
z7-z3563673.0
z8-z3559726.1
z8-z4854833.2
z7-z3348258.4
z18-z4637987.8
z18-z4329572.1
z33-z3920798.9
z47-z6318646.2
z4-z4316972.0
z9-z3514350.8

Generation Build Summary by Technology

TechnologyHOPE final (MW)HOPE new build (MW)
WindOn443258.9292119.1
SolarPV187472.676590.7
NGCC317250.90.0
WindOff29.30.0
Hydro76024.20.0
Coal197052.70.0
NGCT152777.60.0
Thermal73900.10.0
NuC99092.60.0

Network Map: Existing Corridors

USA64 existing transmission network map

Network Map: Optimized Buildouts

USA64 optimized transmission buildout map

Map notes: boundaries follow EPA IPM v6 regions; corridor widths scale with MW. The buildout map overlays HOPE-optimized expansion capacities from output/line.csv.